1.The premier task for Control Group is the products quality control, assigned into certain area within proper management span. To fulfil this responsibility, the position needs to
a)Check the information obtained daily, before the beginning of daily production, ensuring they are in right and updated version, with Planning Group;
b)Daily check the environment, equipments and tools in right conditions as per pre-set manual, before the beginning and during the production;
c)Supervise the work to ensure all processes carried by the contractor or in house labour are according with pre-set production manual. The Control Group has right and responsibility to stop, instruct to correct and record any incorrect process.
d)Inspect the results of work to ensure all of them are complying with the pre-set benchmark in production manual or with quality samples. Sign, fill and store the quality check records properly.
|